Up to 17 expansion units can be connected to one main unit without mutual interference. Ensure the side expansion connectors are clean before snapping them together. 3. Step-by-Step Calibration and Tuning
Download the PDF directly to ensure it contains the latest safety compliance data.
Press "SET" once with the target present and once without. This is ideal for detecting small differences in distance or reflectivity. keyence lv n11n user manual pdf verified
A highly visible orange LED that illuminates when the control output transitions to an active state.
Built-in options for ON-delay, OFF-delay, and one-shot timers (1 ms to 9,999 ms). Essential Installation & Setup Amplifier, Cable, Main unit, NPN - LV-N11N | KEYENCE India Up to 17 expansion units can be connected
The DATUM function stabilizes operation when dirt, dust, or mist builds up on the sensor head.
Best for high-speed production lines where stopping the machinery is not an option. A highly visible orange LED that illuminates when
The lights up green, showing the amplifier is actively tracking and compensating for long-term light fluctuations. 4. Hardware Key Lock Activation
serves as a main cable-type amplifier unit. According to official Keyence Technical Specifications, the unit features the following parameters: Specification Details NPN open-collector Connection Type Pre-wired 2-meter cable Unit Type Main unit (supports expansion units) Case Material Polycarbonate housing and cover Weight Approximately 75 grams Dimensions H 32.6 mm × W 9.8 mm × L 78.7 mm Overcurrent Protection Must use a device rated 30V or more, max 1A Step-by-Step Calibration and Configuration
I can provide the exact wiring pinouts or specific configuration parameters for your application. Share public link